Project Description

Hybrid OK ComplexHybrid OT

  • First modular built Hybrid OT in the Benelux
  • Provided  with Philips FD 20 C-arm and FlexMove option
  • Placed on a steel construction to connect with the OT area on the 1st floor
  • 100 M² first floor
  • 20 M² second floor technical space
  • Built for permanent use, in operation since November 2014